The decision in brief
Choose between H100 and H200 by testing the actual model, memory footprint and response-time target on the exact server configurations offered. For an eight-GPU HGX node, NVIDIA lists 80 GB HBM3 and 3.35 TB/s per H100 SXM GPU, compared with 141 GB HBM3e and 4.8 TB/s per H200 SXM GPU. Those figures describe memory capacity and nominal bandwidth; they do not predict the application's speed or cost.
The extra H200 memory can be useful when model weights, KV cache, activations and runtime buffers constrain an H100 deployment. If the workload fits and meets its service target on H100, assess both complete proposals, including power, network, support and measured throughput. Specify SXM when comparing these numbers: NVIDIA also sells other H100 and H200 variants with different specifications and system arrangements.
Compare like-for-like SXM specifications
| Specification | H100 SXM | H200 SXM |
|---|---|---|
| GPU architecture | Hopper | Hopper |
| HBM capacity per GPU | 80 GB HBM3 | 141 GB HBM3e |
| Nominal memory bandwidth | 3.35 TB/s per GPU | 4.8 TB/s per GPU |
| Aggregate memory, eight GPUs | 640 GB | 1,128 GB |
| Typical platform | HGX H100 | HGX H200 |
The eight-device figures are sums of separate GPU memories; applications cannot assume they are one contiguous memory allocation. NVLink and NVSwitch connectivity can enable high-speed communication in the supported HGX platform, but the application must implement a compatible parallelism strategy. Confirm the baseboard, interconnect, firmware and software combination in the supplier's bill of materials.
On these specific published figures, 141 ÷ 80 is about 1.76, while 4.8 ÷ 3.35 is about 1.43. These are ratios of nominal capacity and bandwidth, respectively—not predicted speedups. NVIDIA also documents H100 NVL and H200 NVL options, so avoid transferring this SXM table to PCIe or NVL configurations without checking their own specifications.
Build a realistic memory budget
Begin with model weights. For example, 70 billion parameters stored at two bytes each occupy roughly 140 billion bytes, or 140 GB in decimal units, before runtime overhead. This is a planning calculation, not a claim that the full workload will fit on one 141 GB GPU. KV cache, temporary tensors, memory fragmentation and runtime allocations also require space. Quantization may reduce weight storage, but its effective memory consumption and quality need measurement with the chosen model and runtime.
Record a representative prompt-length distribution, maximum output length, batch policy and target concurrency. For training or fine-tuning, separately account for gradients, optimizer state and activations as applicable. Measure peak allocation under representative load and agree a margin for operational changes. Report units consistently: vendor GB and software-reported GiB can appear different even when describing the same bytes.
If the model does not fit, compare supported options: sharding across GPUs, an accepted quantization method, lower concurrency or a different accelerator. Each has an operational or quality trade-off. H200's larger per-device memory may reduce pressure in a particular scenario, but it does not guarantee the best deployment or remove the need to benchmark it.
Measure bandwidth without confusing it with interconnect
HBM bandwidth measures data transfer between a GPU and its local memory. NVLink describes GPU interconnect, and Ethernet or InfiniBand provides external networking; these are separate paths. Summing eight GPUs' local bandwidth does not tell you how quickly one GPU can read a neighbour's memory or how fast a cluster can exchange data.
For inference, compare time to first token, output tokens per second, request throughput and tail latency at the same service-level target. Keep model revision, precision, input/output lengths, concurrency, runtime and batching policy consistent. Record memory use and GPU utilisation alongside the result. For training, compare the same dataset, precision, global batch and objective; note scaling efficiency and time per step rather than relying on peak theoretical figures.
If a candidate uses tensor parallelism, document the number of GPUs, topology and software settings. A change in partitioning can alter communication overhead and capacity. Treat results from a manufacturer's benchmark as evidence only for its stated workload and conditions, not as a promise for a different model.
Compare whole-server proposals
Obtain the exact server SKU, GPU and baseboard revision, CPU, installed RAM, storage, network adapters and firmware versions. Check the software support matrix for your operating system, driver, framework and deployment tools. A model name alone does not confirm the complete configuration or compatibility.
Request the manufacturer's electrical and thermal specifications for each actual server. Check power feeds and redundancy, rack depth and weight, inlet conditions, airflow, cabling and service access with the facility. Power-supply nameplate totals are not the same as measured operating consumption. For a cluster, include switches, optics, storage and management infrastructure in the comparison.
For costs, use the same evaluation period and workload. Include equipment, maintenance, software, facility power and networking; state utilisation and energy-price assumptions. Prices, availability, delivery and warranty depend on the specific offer and market, so confirm them rather than inferring them from an international product listing.
Acceptance checklist
- Record model revision, precision, context distribution, concurrency, latency target and expected growth.
- Confirm GPU form factor, installed capacity, topology and full server bill of materials.
- Measure peak memory use and benchmark the same workload under a documented runtime on each candidate.
- Have the facility approve power, cooling, rack and networking requirements for the quoted system.
- Agree warranty, delivery and acceptance criteria; verify the delivered inventory and run the agreed health checks.
For an example of an eight-GPU system, read the H200 server guide. Browse H100 and H200 options or contact AI Server Lab with your workload and site constraints. Final configuration, availability and terms are confirmed per enquiry.

