Compal has described three NVIDIA-based platforms in its SC26 portfolio: the air-cooled SGX30-2 and direct-liquid-cooled OG430-2-L1 using HGX B300, and the OG231-2-L1 using HGX Rubin NVL8. These are manufacturer announcements and demonstrations; they do not establish the price, regional availability, delivery date or final bill of materials of a particular order.

The original Russian article reported Compal's plans before the event. This English adaptation incorporates the company's additional November 18, 2026 announcement, while distinguishing its specifications and projections from independently measured application results.

Two HGX B300 cooling approaches

In its SC26 portfolio announcement, Compal describes SGX30-2 as air-cooled and OG430-2-L1 as directly liquid-cooled. Both are presented as HGX B300 server options. This distinction affects facility engineering, service procedures and the equipment that must be included in a quotation; it does not imply that the two configurations have identical CPUs, networking or power settings.

For an air-cooled offer, request inlet temperature limits, airflow direction, permitted rack arrangement and acoustic requirements. For direct liquid cooling, request supply and return temperature ranges, coolant chemistry, flow, pressure drop, leak detection, connectors and the supported coolant distribution unit. Determine which components and commissioning services are included in the offer. A liquid-cooled CPU or GPU does not establish that the entire server rejects no heat to room air.

What Compal says about OG231-2-L1

Compal's November 18 announcement describes a rack containing up to nine direct-liquid-cooled OG231-2-L1 servers, each with eight Rubin GPUs. The stated maximum is therefore nine times eight, or 72 GPUs per rack. This is a manufacturer-described configuration, not proof that all nine servers are available, installed or interconnected in a particular deployment.

The same announcement cites NVIDIA's HGX Rubin NVL8 peak NVFP4 and aggregate NVLink 6 switch figures. Read each number with its precision, system boundary and conditions. A theoretical NVFP4 peak does not establish LLM tokens per second, training convergence time, FP64 performance or power efficiency for an application. Compal also cites an NVIDIA projection of up to ten times token throughput against HGX B200 for specific agentic inference workloads. That is a conditional vendor projection, not a universal speedup or an independent benchmark.

The network and rack are part of the system

Compal's portfolio announcement also discusses BlueField-4 DPUs, ConnectX-9 SuperNICs, Spectrum-6 switches and a Vera CPU compute tray. These products perform different roles, and their appearance in the same announcement does not mean all are included in every server. Ask for the network topology and a dated bill of materials: GPU links, host adapters, switch ports, cables, transceivers, management paths and subscription or software support.

As an illustrative capacity calculation, nine eight-GPU nodes make 72 accelerators. If an application used only six nodes, it would have 48 devices before accounting for failed or reserved resources. Neither count proves the workload scales linearly, fits in aggregate memory, or meets an availability target. Determine the communication pattern and benchmark the exact fabric and workload.

Questions before committing to a platform

Ask the supplier to identify production status, the exact OEM SKU, GPU revision, platform firmware and software support matrix. Request a system-level power envelope, rack layout, redundancy design, coolant interface and maintenance procedure. Separate the manufacturer's maximum configuration from the items in the actual purchase order.

For acceptance, agree on a representative model or training job, numerical precision, input data, concurrency and error thresholds. Record device inventory, topology, driver and firmware versions, rack conditions, link errors and sustained performance. Test recovery procedures with the supplier's support instructions. Do not treat a trade-show demonstration as a completed site qualification.

Review AI server selection or contact AI Server Lab with your workload and site constraints. Pricing, delivery, support and product availability vary by market and require confirmation.