01 · Describe the workload
Share your model, training or inference task, target performance and deployment environment.
GPU accelerator
MI325X develops the MI300X platform and increases the capacity of HBM3E per accelerator. When comparing servers, the numerical precision, model size, and available interconnects for the selected board are important.
The exact SKU, accelerator count, interconnect, power and cooling depend on the final system.

Overview
AMD specifies 256GB HBM3E and 6TB/s peak throughput; the actual system depends on the OEM platform.
Reference: Manufacturer documentation ↗
Selection
Model size, software, performance targets and site requirements determine the appropriate server. We confirm the exact SKU, configuration, availability, pricing and delivery terms for each enquiry.
Share your model, training or inference task, target performance and deployment environment.
Review the accelerator, software stack, chassis, networking, power and cooling.
Confirm the precise system specification and commercial terms before ordering.
inference and training of models that require large memory of a single GPU, as well as HPC. The final system depends on model size, memory and accelerator interconnects.
256 GB HBM3E and 6 TB/s according to official AMD materials. Confirm the exact SKU and system configuration before ordering.
The exact accelerator model and count, platform, CPU, system memory, storage, networking, power, cooling and delivery terms all affect the final quote.