On NVIDIA HGX B300 and DGX B300 systems, NVLink fabric health depends on more than GPU inventory. Management components include Fabric Manager and NVLink Subnet Manager. If an application cannot use the expected accelerator communication path, checking that a service is merely running is not enough: examine versions, device registration, topology and a representative workload.

First preserve evidence and agree on the impact to active jobs. Restarting services, resetting GPUs or rebooting can interrupt computation. Select recovery actions from the documentation for the exact platform, software and symptoms rather than applying a universal command.

Identify the components

The NVIDIA Fabric Manager guide describes NVSwitch systems and error handling. NVIDIA's Cluster Readiness Engine troubleshooting guide identifies NVLink Subnet Manager, or NVLSM, alongside Fabric Manager for fourth-generation NVSwitch systems including HGX/DGX B200 and B300.

Physical links, management processes and application access are separate checks. A service can be active while a device is not registered with the fabric or a particular container or VM lacks the required path. Verify behavior for the installed driver and OEM platform.

Do not automatically apply A100 or H100 procedures to B300. Management and diagnostics vary by generation. NVIDIA notes, for example, that nvswitch-audit is not supported on the corresponding HGX/DGX B200/B300 systems; its absence alone does not prove a hardware failure.

Preserve evidence and scope the impact

Record the exact server SKU, GPU count and identifiers, topology, driver, CUDA, Fabric Manager and NVLSM versions, and incident time. Preserve relevant system and Fabric Manager logs under the organization's data-handling rules. Avoid exposing secrets or user data.

Compare with the last known good run: firmware, drivers, services, MIG mode, virtualization and application changes may matter. Determine whether the problem affects every workload or only one GPU group, container or VM. Coordinate a maintenance window and checkpoint or move jobs where supported before changing the system.

Check versions, registration and paths

NVIDIA recommends checking Fabric Manager status and alignment with the driver; its cluster troubleshooting documentation also calls for checking NVLSM on the relevant fourth-generation systems. Verify package and service details for the actual release.

Confirm that all expected GPUs are discovered and registered with the fabric, then compare actual topology with the approved design. GPU inventory alone does not prove that the application's required peer path works. Check the same host, container or VM environment where the failure occurred.

If MIG or virtualization is enabled, account for the supported profiles and communication restrictions of that stack. A shared physical GPU can host multiple instances affected by maintenance; coordinate all users before changing mode.

Recovery order matters

NVIDIA notes that some fabric-state-loss scenarios require more than restarting a service and may involve GPU reset or a reboot. The applicable action and order depend on the platform, software and specific condition. Follow the current vendor procedure and coordinate with the OEM or site operator.

An unrestricted reset can affect every GPU on a host and related components. Determine the scope, drain workloads and agree on downtime before any disruptive action. After recovery, verify registration, required paths and the actual application—not just a green service status. Preserve new logs and escalate recurring or unexplained errors.

Prepare evidence for support

Build a timeline of the last successful job, first errors and intervening changes. Record affected nodes and devices and whether a test-queue workload reproduces the issue. Distinguish observations from hypotheses: an unavailable path does not by itself prove that a particular cable failed. B200/B300 switch telemetry and tools differ from older generations; ask support which counters and versions apply. Sanitize secrets and client data before sharing logs, and coordinate any reproduction test.

Measure operational impact

If a hypothetical node is unavailable for 18 minutes during a 30-minute maintenance window, the arithmetic leaves 12 minutes. That is not an availability metric or SLA guarantee: data recovery and queued work may take longer. Account for diagnosis, repair, validation and traffic restoration separately.

For training, record the last valid checkpoint and repeated work. For inference, measure errors, latency and throughput after traffic moves. Define fallback capacity and recovery criteria before an incident, not during one.

Return-to-service checklist

  1. Confirm agreed power, cooling and maintenance work are complete.
  2. Verify driver and management-component versions and status.
  3. Check expected GPU registration, topology and required paths.
  4. Run supported diagnostics and a representative test-queue workload.
  5. Compare errors, latency and results with acceptance criteria.
  6. Restore traffic according to the operational plan while monitoring.

A short check does not guarantee every long job will succeed. Define an observation period and an escalation threshold appropriate to the service.

Provide the supplier with the exact HGX or DGX SKU, software versions, MIG or virtualization mode, symptoms, incident time and sanitized logs. Request a platform-specific recovery and support procedure. Explore the B300 catalog or use the contact form; commercial conditions require confirmation.